يوم البحّارة لعام 2020 | رسالة من الأمين العام للمنظمة البحرية الدولية

Current Nawat at Egyptian ports
  • Red Sea Next Gemini (Al-Haqaah) Start 3 July - Duration 13 day ، Hot
  • Red Sea Next Gemini (Al-Hanaah) Start 16 July - Duration 13 day ، Hot
Commercial Ports
Commercial Ports

 

Port Services and Facilities

Repairs

Dry Dock : Suez shipyard company operates inside the port and undertakes all repairs of vessels of different types and tonnage.
The company owns a dry dock (44*22m dimensions and draught 22 feets) for vessels of tonnage 50000 ton and loss.

Floating dock: The mentioned company owns a floating dock for lifting vessels of tonnage 300000 ton and less and for partial lifting of vessels of tonnage 30000 ton and less, in addition to an equipped workshop for different repairs

Bunkering and Supplies

  • Fresh water
  • Solar
  • Diesel
  • Spare parts
  • Bukering vessels
  • Waste water reception
  • Food stuff
  • Pilotage and tugging
  • Fumigation: is undertaken by quarantine, warehouses and silos to arriving and departing vessels
  • Cleaning fees: 5% for all types of vessels except general cargo vessels it's 3%

Security, Safety and Environmental Preservation Properties

  • Medical capabilities
  • Fire Fighting
  • Pollution combating
  • Temprature measuring devices for swine flu prevention in the arrival hall

IMO Secretary-General

Tackling COVID-19 a voyage together

Achievements